Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1992 |
Principal Product | Injection Molded Plastic Products |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 134,000 |
Annual Production | 4,400,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $356,460 | 7,355,803 | kWh | $0.05 |
Natural Gas | $46,034 | 12,823 | MMBtu | $3.59 |
TOTAL ENERGY COSTS | $402,494 | |||
RECOMMENDED SAVINGS* | $47,180 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $47,180 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Primary Product | Electricity Usage | Natural Gas | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $7,020 Cost: $1,250 |
$7,020 | 136,577 | - | - | - | - | - | - |
$7,020 136,577 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $2,990 Cost: $1,800 |
$2,990 | 89,097 | - | - | - | - | - | - |
$2,990 89,097 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,480 Cost: $2,560 |
$3,480 | 71,805 | - | - | - | - | - | - |
$3,480 71,805 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,610 Cost: $40 |
$1,610 | 48,066 | - | - | - | - | - | - |
$1,610 48,066 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $6,430 Cost: $6,000 |
- | - | $6,430 | 1,791 | - | - | - | - |
- - kWh |
$6,430 1,791 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $5,850 Cost: $7,600 |
$(-130) | (-2,638) | $5,980 | 1,667 | - | - | - | - |
$(-130) (-2,638) kWh |
$5,980 1,667 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $490 Cost: $780 |
$490 | 9,965 | - | - | - | - | - | - |
$490 9,965 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $590 Cost: $1,350 |
$400 | 12,016 | $190 | 54 | - | - | - | - |
$400 12,016 kWh |
$190 54 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $5,970 Cost: $12,000 |
$350 | 7,034 | - | - | - | - | $5,620 | - |
$350 7,034 kWh |
- - MMBtu |
- - $ |
$5,620 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $230 Cost: $530 |
- | - | $230 | 64 | - | - | - | - |
- - kWh |
$230 64 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,470 Cost: $6,280 |
$3,470 | 71,512 | - | - | - | - | - | - |
$3,470 71,512 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $9,050 Cost: $30,250 |
- | - | - | - | $9,050 | - | - | - |
- - kWh |
- - MMBtu |
$9,050 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,180 Cost: $70,440 |
$19,680 | 443,434 | $12,830 | 3,576 | $9,050 | - | $5,620 | - | $19,680 443,434 kWh |
$12,830 3,576 MMBtu |
$9,050 - $ |
$5,620 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $47,180 Cost: $70,440 |
$19,680 | 443,434 | $12,830 | 3,576 | $9,050 | - | $5,620 | - | $19,680 443,434 kWh |
$12,830 3,576 MMBtu |
$9,050 - $ |
$5,620 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Primary Product | Electricity Usage | Natural Gas | Administrative Changes | Primary Product |