IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,804

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0074 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,850 $2,800 Implemented
AM0074 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,840 $0 Implemented
AM0074 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,600 $2,500 Implemented
AM0074 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,360 $660 Implemented
AM0074 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,580 $1,000 Implemented
AM0074 # 07 Y:1989 07 1989 INSULATE BARE EQUIPMENT $665 $270 Implemented
TN0380 # 01 Y:1989 01 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $67,651 $61,200 Implemented
TN0380 # 02 Y:1989 02 1989 REPAIR AND ELIMINATE STEAM LEAKS $4,181 $75 Implemented
TN0380 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,143 $6,750 Implemented
TN0380 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,910 $420 Implemented
RU0069 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,131 $700 Implemented
RU0069 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,084 $0 Implemented
MA0159 # 02 Y:1989 02 1989 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $684 $3,027 Implemented
MA0159 # 03 Y:1989 03 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $2,298 $2,700 Implemented
MA0159 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $444 $297 Implemented
MA0159 # 06 Y:1989 06 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $752 $0 Implemented
KU0286 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,513 $6,446 Implemented
KU0286 # 02 Y:1989 02 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $235 $0 Implemented
KU0286 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,139 $500 Implemented
KU0286 # 04 Y:1989 04 1989 INSTALL AUTOMATIC STACK DAMPER $6,820 $5,625 Implemented
KU0286 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,698 $1,800 Implemented
KU0286 # 06 Y:1989 06 1989 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,815 $20,000 Implemented
KU0286 # 07 Y:1989 07 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $204 $250 Implemented
TN0371 # 01 Y:1989 01 1989 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $24,816 $13,460 Implemented
TN0371 # 02 Y:1989 02 1989 REPAIR AND ELIMINATE STEAM LEAKS $5,334 $600 Implemented