IAC logo
IAC Assessment: MA0188
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0188
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1990
Principal Product RUBBER COATED PRODUCTS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,750
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,225 992,966 kWh $0.08
Fuel Oil #6 $117,003 34,352 MMBtu $3.41
TOTAL ENERGY COSTS $197,228
RECOMMENDED SAVINGS* $23,380 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,863
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$7,209
Cost:
$7,000
- - $7,209 2,114 - - -
-
kWh
$7,209
2,114
MMBtu
-
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$4,449
Cost:
$1,600
- - $5,889 1,727 $(-1,440) - -
-
kWh
$5,889
1,727
MMBtu
$(-1,440)
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,213
Cost:
$2,557
- - $6,213 1,822 - - -
-
kWh
$6,213
1,822
MMBtu
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,823
Cost:
$185
- - $2,823 828 - - -
-
kWh
$2,823
828
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,378
Cost:
$245
- - $1,378 404 - - -
-
kWh
$1,378
404
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$785
Cost:
$2,400
$785 9,672 - - - - $785
9,672
kWh
-
-
MMBtu
-
-
$
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$308
Cost:
$677
$308 3,810 - - - - $308
3,810
kWh
-
-
MMBtu
-
-
$
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$215
Cost:
$545
- - $215 63 - - -
-
kWh
$215
63
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,380
Cost:
$15,209
$1,093 13,482 $23,727 6,958 $(-1,440) - $1,093
13,482
kWh
$23,727
6,958
MMBtu
$(-1,440)
-
$
TOTAL IMPLEMENTED Savings:
$15,863
Cost:
$7,532
$785 9,672 $16,518 4,844 $(-1,440) - $785
9,672
kWh
$16,518
4,844
MMBtu
$(-1,440)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes