Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1990 |
Principal Product | RUBBER COATED PRODUCTS |
NAICS | n/a |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,750 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $80,225 | 992,966 | kWh | $0.08 |
Fuel Oil #6 | $117,003 | 34,352 | MMBtu | $3.41 |
TOTAL ENERGY COSTS | $197,228 | |||
RECOMMENDED SAVINGS* | $23,380 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,863 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #6 | Administrative Changes | Electricity Usage | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $7,209 Cost: $7,000 |
- | - | $7,209 | 2,114 | - | - |
- - kWh |
$7,209 2,114 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $4,449 Cost: $1,600 |
- | - | $5,889 | 1,727 | $(-1,440) | - |
- - kWh |
$5,889 1,727 MMBtu |
$(-1,440) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $6,213 Cost: $2,557 |
- | - | $6,213 | 1,822 | - | - |
- - kWh |
$6,213 1,822 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $2,823 Cost: $185 |
- | - | $2,823 | 828 | - | - |
- - kWh |
$2,823 828 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,378 Cost: $245 |
- | - | $1,378 | 404 | - | - |
- - kWh |
$1,378 404 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $785 Cost: $2,400 |
$785 | 9,672 | - | - | - | - |
$785 9,672 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $308 Cost: $677 |
$308 | 3,810 | - | - | - | - |
$308 3,810 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $215 Cost: $545 |
- | - | $215 | 63 | - | - |
- - kWh |
$215 63 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,380 Cost: $15,209 |
$1,093 | 13,482 | $23,727 | 6,958 | $(-1,440) | - | $1,093 13,482 kWh |
$23,727 6,958 MMBtu |
$(-1,440) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,863 Cost: $7,532 |
$785 | 9,672 | $16,518 | 4,844 | $(-1,440) | - | $785 9,672 kWh |
$16,518 4,844 MMBtu |
$(-1,440) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #6 | Administrative Changes | Electricity Usage | Fuel Oil #6 | Administrative Changes |