IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0280 # 02 Y:1989 02 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,382 $0 Implemented
KU0280 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $440 $100 Implemented
KU0280 # 05 Y:1989 05 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $250 $0 Implemented
KU0280 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $143 $40 Implemented
KU0218 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,063 $25,287 Implemented
KU0218 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $5,457 $2,500 Implemented
KU0218 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,325 $500 Implemented
KU0218 # 07 Y:1987 07 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,335 $305 Implemented
KU0150 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $749 $200 Implemented
KU0150 # 05 Y:1985 05 1985 USE COMPRESSOR AIR FILTERS $214 $0 Implemented
KU0150 # 08 Y:1985 08 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $284 $100 Implemented
KU0150 # 09 Y:1985 09 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,016 $131 Implemented
KU0150 # 11 Y:1985 11 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $719 $265 Implemented
KU0094 # 01 Y:1983 01 1983 INSTALL TIMERS AND/OR THERMOSTATS $3,596 $800 Implemented
KU0094 # 02 Y:1983 02 1983 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,270 $360 Implemented
KU0094 # 03 Y:1983 03 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,187 $715 Implemented
KU0094 # 04 Y:1983 04 1983 INSTALL AUTOMATIC STACK DAMPER $1,127 $1,200 Implemented
KU0094 # 05 Y:1983 05 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $953 $300 Implemented
KU0094 # 06 Y:1983 06 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,925 $240 Implemented
KU0094 # 07 Y:1983 07 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $342 $0 Implemented
KU0087 # 01 Y:1983 01 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,398 $30,000 Implemented
KU0087 # 02 Y:1983 02 1983 OPTIMIZE PLANT POWER FACTOR $15,570 $15,000 Implemented
KU0087 # 03 Y:1983 03 1983 MODERATE COOLING TOWER OUTLET TEMPERATURE $4,858 $0 Implemented
KU0087 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $39,664 $35,000 Implemented
KU0087 # 05 Y:1983 05 1983 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,056 $1,680 Implemented