IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0755 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $73,133 $200,000 Not Implemented
MA0755 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $43,907 $196,307 Not Implemented
MA0755 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,196 $21,560 Implemented
MA0755 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,821 $4,300 Not Implemented
MA0755 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,678 $6,000 Not Implemented
MA0755 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,653 $2,955 Not Implemented
WM0082 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $15,282 $26,000 Not Implemented
WM0082 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,220 $23,066 Implemented
WM0082 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,011 $3,340 Implemented
WM0082 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $5,195 $825 Not Implemented
WM0082 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $280 Implemented
WM0082 # 06 Y:2016 06 2016 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,896 $2,068 Not Implemented
WM0082 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,050 $1,650 Not Implemented
WM0082 # 08 Y:2016 08 2016 USE SYNTHETIC LUBRICANT $2,423 $9,400 Not Implemented
SD0523 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $38,152 $147,781 Implemented
SD0523 # 02 Y:2016 02 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,463 $69,877 Implemented
SD0523 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,883 $11,174 Implemented
SD0523 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,728 $24,400 Implemented
SD0523 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,236 $1,000 Implemented
SD0523 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,188 $1,500 Implemented
SD0523 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,341 $700 Implemented
SD0523 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,304 $3,171 Implemented
SD0523 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $845 $36 Implemented
OK0925 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,255 $71,792 Not Implemented
OK0925 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,930 $9,328 Not Implemented