Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,100
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1503 # 06 Y:2015 | 06 | 2015 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,001 | $5,000 | Implemented |
UK1503 # 07 Y:2015 | 07 | 2015 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,126 | $1,460 | Implemented |
UK1503 # 08 Y:2015 | 08 | 2015 | MINIMIZE WATER USAGE | $556 | $2,470 | Implemented |
UK1503 # 09 Y:2015 | 09 | 2015 | INSULATE BARE EQUIPMENT | $17,159 | $9,380 | Implemented |
UK1503 # 10 Y:2015 | 10 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,034 | $2,460 | Implemented |
UK1503 # 11 Y:2015 | 11 | 2015 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $62,362 | $45,000 | Implemented |
OK0908 # 01 Y:2015 | 01 | 2015 | OPTIMIZE PLANT POWER FACTOR | $6,429 | $11,430 | Implemented |
OK0908 # 02 Y:2015 | 02 | 2015 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,662 | $120 | Not Implemented |
OK0908 # 03 Y:2015 | 03 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $621 | $432 | Implemented |
OK0908 # 04 Y:2015 | 04 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,829 | $59,743 | Not Implemented |
IP0036 # 01 Y:2015 | 01 | 2015 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $102,924 | $0 | Not Implemented |
IP0036 # 02 Y:2015 | 02 | 2015 | USE OPTIMUM TEMPERATURE | $1,853 | $0 | Not Implemented |
IP0036 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $1,622 | $560 | Not Implemented |
IP0036 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,492 | $0 | Not Implemented |
IP0036 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,188 | $0 | Not Implemented |
IP0036 # 06 Y:2015 | 06 | 2015 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $61 | $19 | Not Implemented |
IP0036 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,161 | $1,811 | Not Implemented |
IP0036 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,780 | $1,780 | Not Implemented |
IP0036 # 09 Y:2015 | 09 | 2015 | RECOVER AND REUSE COOLING WATER | $188 | $120 | Not Implemented |
IP0036 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $106 | $240 | Not Implemented |
WM0063 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $171 | $294 | Implemented |
WM0063 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,045 | $1,800 | Implemented |
WM0063 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $2,876 | $2,860 | Not Implemented |
WM0063 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,305 | $5,750 | Not Implemented |
WM0063 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,548 | $52,000 | Not Implemented |