Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,100
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0895 # 02 Y:2014 | 02 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,208 | $0 | Implemented |
UD0895 # 03 Y:2014 | 03 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $48,509 | $7,500 | Implemented |
UD0895 # 04 Y:2014 | 04 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,209 | $0 | Implemented |
UD0895 # 05 Y:2014 | 05 | 2014 | ADD AREA LIGHTING SWITCHES | $1,613 | $1,575 | Implemented |
UD0895 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $1,252 | $2,900 | Not Implemented |
UD0895 # 07 Y:2014 | 07 | 2014 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $249 | $510 | Implemented |
UD0895 # 08 Y:2014 | 08 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,823 | $16,000 | Implemented |
UD0895 # 09 Y:2014 | 09 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,388 | $800 | Implemented |
UD0895 # 10 Y:2014 | 10 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,520 | $4,275 | Implemented |
UA0111 # 01 Y:2013 | 01 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,225 | $851 | Implemented |
UA0111 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,878 | $2,530 | Implemented |
UA0111 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,637 | $100 | Implemented |
UA0112 # 01 Y:2013 | 01 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,737 | $19,304 | Not Implemented |
UA0112 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,385 | $2,330 | Implemented |
UA0112 # 03 Y:2013 | 03 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,177 | $878 | Implemented |
UA0112 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,965 | $49,792 | Not Implemented |
UA0112 # 05 Y:2013 | 05 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $1,143 | $520 | Not Implemented |
WM0036 # 01 Y:2013 | 01 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $288 | $0 | Implemented |
WM0036 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $396 | $200 | Not Implemented |
WM0036 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $783 | $4,255 | Not Implemented |
WM0036 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $1,540 | $5,355 | Not Implemented |
WM0036 # 05 Y:2013 | 05 | 2013 | IMPROVE SPACE COMFORT CONDITIONING | $3,641 | $595 | Not Implemented |
WM0036 # 06 Y:2013 | 06 | 2013 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $7,574 | $780 | Not Implemented |
WM0036 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,340 | $1,900 | Implemented |
TT0120 # 01 Y:2013 | 01 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,400 | $85 | Implemented |