IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

542

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0196 # 02 Y:1999 02 1999 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $4,659 $5,000 Not Implemented
HO0196 # 03 Y:1999 03 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,000 $500 Implemented
HO0196 # 04 Y:1999 04 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,170 $1,000 Not Implemented
HO0196 # 05 Y:1999 05 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,000 $300 Implemented
HO0196 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $2,340 $5,000 Not Implemented
HO0196 # 07 Y:1999 07 1999 USE A RAG RECYCLE SERVICE $336 $200 Not Implemented
HO0196 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $300 $250 Not Implemented
HO0175 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,263 $16,755 Implemented
HO0175 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $3,201 $168 Implemented
HO0175 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $320 $500 Not Implemented
HO0175 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $800 $300 Implemented
HO0175 # 05 Y:1998 05 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $9,375 $0 Implemented
HO0175 # 06 Y:1998 06 1998 CLEAR AND RENT EXISTING SPACE $18,000 $3,000 Implemented
MA0426 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $9,368 $24,200 Not Implemented
MA0426 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $586 $458 Implemented
MA0426 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $623 $25 Implemented
MA0426 # 04 Y:1998 04 1998 USE RADIANT HEATER FOR SPOT HEATING $902 $1,975 Not Implemented
MA0426 # 05 Y:1998 05 1998 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $2,320 $9,100 Not Implemented
MA0414 # 01 Y:1998 01 1998 MOVE BOILER TO MORE EFFICIENT LOCATION $64,705 $204,550 Not Implemented
MA0414 # 02 Y:1998 02 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,670 $12,451 Implemented
MA0414 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,293 $12,457 Not Implemented
MA0414 # 04 Y:1998 04 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $1,405 $453 Implemented
MA0414 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,508 $23,028 Implemented
MA0414 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $21,122 $50,000 Not Implemented
MA0414 # 07 Y:1998 07 1998 INSTALL OCCUPANCY SENSORS $1,182 $910 Implemented