IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

556

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0335 # 07 Y:1987 07 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,070 $0 Implemented
GT0268 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $561 $1,254 Not Implemented
GT0268 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7 $0 Not Implemented
GT0268 # 03 Y:1985 03 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $480 $4,250 Not Implemented
GT0268 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $150 Implemented
GT0266 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $5,053 $3,000 Implemented
GT0266 # 02 Y:1985 02 1985 INCREASE AMOUNT OF CONDENSATE RETURNED $21,278 $20,000 Implemented
GT0266 # 03 Y:1985 03 1985 REPAIR AND ELIMINATE STEAM LEAKS $6,345 $300 Implemented
GT0266 # 04 Y:1985 04 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $2,960 $528 Implemented
GT0266 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,085 $6,000 Implemented
GT0266 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,577 $0 Implemented
GT0258 # 01 Y:1985 01 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,573 $2,500 Implemented
GT0258 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,450 $2,602 Implemented
GT0258 # 03 Y:1985 03 1985 REDESIGN PROCESS $45,000 $22,560 Implemented
GT0258 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,613 $6,000 Implemented
GT0258 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,943 $75 Not Implemented
GT0258 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,370 $4,472 Implemented
GT0240 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $360 $363 Implemented
GT0240 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $93 Implemented
GT0240 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $453 $400 Implemented
GT0240 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $180 $250 Implemented
GT0240 # 05 Y:1985 05 1985 USE MINIMUM SAFE OVEN VENTILATION $780 $0 Implemented
GT0240 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,420 $5,000 Implemented
GT0241 # 01 Y:1985 01 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,960 $3,000 Implemented
GT0241 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $453 $257 Implemented