Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1987
Principal Product MOLDED PLASTIC COMPONENTS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 50,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,099 4,050,117 kWh $0.06
Natural Gas $10,137 1,767 MMBtu $5.74
TOTAL ENERGY COSTS $239,236
RECOMMENDED SAVINGS* $22,476 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,646
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,710
Cost:
$1,200
$5,710 - - - $5,710
-
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,561
Cost:
$6,000
$11,561 210,727 - - $11,561
210,727
kWh
-
-
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$460
Cost:
$1,000
- - $460 80 -
-
kWh
$460
80
MMBtu
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$1,000
Cost:
$2,900
- - $1,000 174 -
-
kWh
$1,000
174
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,830
Cost:
$8,000
- - $1,830 319 -
-
kWh
$1,830
319
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$845
Cost:
$5,130
$845 15,533 - - $845
15,533
kWh
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,070
Cost:
-
$1,070 19,343 - - $1,070
19,343
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,476
Cost:
$24,230
$19,186 245,603 $3,290 573 $19,186
245,603
kWh
$3,290
573
MMBtu
TOTAL IMPLEMENTED Savings:
$19,646
Cost:
$13,330
$19,186 245,603 $460 80 $19,186
245,603
kWh
$460
80
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas