Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
16,964
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0651 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,418 | $12,200 | Not Implemented |
UD0651 # 07 Y:2002 | 07 | 2002 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $7,528 | $0 | Implemented |
UD0651 # 08 Y:2002 | 08 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,833 | $1,125 | Implemented |
UD0651 # 09 Y:2002 | 09 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $751 | $1,737 | Implemented |
UD0651 # 10 Y:2002 | 10 | 2002 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $313 | $0 | Implemented |
MA0517 # 01 Y:2002 | 01 | 2002 | COVER OPEN TANKS | $30,107 | $4,262 | Implemented |
MA0517 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,697 | $33,800 | Not Implemented |
MA0517 # 03 Y:2002 | 03 | 2002 | USE MINIMUM SAFE OVEN VENTILATION | $7,427 | $2,100 | Implemented |
MA0517 # 04 Y:2002 | 04 | 2002 | $6,528 | $0 | Implemented | |
MA0517 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $6,349 | $9,636 | Implemented |
MA0517 # 06 Y:2002 | 06 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,140 | $5,200 | Implemented |
MA0517 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,164 | $2,500 | Implemented |
MA0517 # 08 Y:2002 | 08 | 2002 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $853 | $1,515 | Implemented |
UD0650 # 01 Y:2002 | 01 | 2002 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $99,990 | $64,500 | Not Implemented |
UD0650 # 02 Y:2002 | 02 | 2002 | $37,195 | $95,000 | Not Implemented | |
UD0650 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,914 | $12,000 | Not Implemented |
UD0650 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $799 | $2,372 | Not Implemented |
UD0650 # 05 Y:2002 | 05 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $213 | $0 | Implemented |
UD0650 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $133 | $15 | Not Implemented |
UD0650 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $131 | $406 | Not Implemented |
UM0220 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,258 | $25,000 | Not Implemented |
UM0220 # 02 Y:2002 | 02 | 2002 | MAINTAIN MACHINES TO REDUCE LEAKS | $7,380 | $1,150 | Implemented |
UM0220 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $973 | $1,700 | Implemented |
UM0220 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,947 | $2,064 | Not Implemented |
UM0220 # 05 Y:2002 | 05 | 2002 | AIR CONDITION ONLY SPACE NECESSARY | $4,385 | $800 | Not Implemented |