IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0210 # 03 Y:2022 03 2022 INSTALL SET-BACK TIMERS $4,951 $2,500 Implemented
DL0210 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $264,494 $0 Not Implemented
DL0210 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $93,984 $5,553 Not Implemented
DL0210 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN WATER LINES AND VALVES $17,648 $50,000 Not Implemented
DL0210 # 07 Y:2022 07 2022 REDUCE EXCESSIVE BOILER BLOWDOWN $17,995 $0 Not Implemented
DL0210 # 08 Y:2022 08 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,443 $20,000 Not Implemented
DL0210 # 09 Y:2022 09 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $86,400 $1,000,000 Not Implemented
AM0853 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $74,850 $5,000 Implemented
AM0853 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $17,040 $19,415 Not Implemented
AM0853 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,530 $13,140 Implemented
AM0853 # 04 Y:2022 04 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,455 $4,175 Not Implemented
AM0853 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,715 $500 Implemented
AM0853 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $2,537 $2,030 Not Implemented
AM0853 # 07 Y:2022 07 2022 REPAIR OR REPLACE STEAM TRAPS $2,070 $275 Implemented
AM0853 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,170 $345 Implemented
AM0853 # 09 Y:2022 09 2022 USE SYNTHETIC LUBRICANT $830 $500 Implemented
AM0853 # 10 Y:2022 10 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $340 $300 Implemented
MZ0335 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $558 $480 Implemented
MZ0335 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $4,654 $7,600 Implemented
MZ0335 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $1,834 $680 Implemented
MZ0335 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $701 $1,200 Implemented
MZ0335 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $106,813 $957,388 Not Implemented
MZ0335 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $1,330 Implemented
MZ0335 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,141 $9,100 Not Implemented
MZ0335 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $449 $200 Not Implemented