IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16,976

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0688 # 02 Y:2000 02 2000 $211,827 $100,400 Implemented
TN0688 # 03 Y:2000 03 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $29,380 $27,925 Not Implemented
TN0688 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $23,435 $12,800 Not Implemented
TN0688 # 05 Y:2000 05 2000 REDUCE SCRAP PRODUCTION $29,580 $0 Not Implemented
TN0688 # 06 Y:2000 06 2000 $20,548 $1,075 Not Implemented
TN0688 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,871 $0 Not Implemented
TN0688 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $1,965 $735 Not Implemented
TN0688 # 09 Y:2000 09 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,290 $0 Implemented
TN0688 # 10 Y:2000 10 2000 INSTALL TIMERS AND/OR THERMOSTATS $1,250 $1,500 Not Implemented
AS0279 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,131 $4,889 Not Implemented
AS0279 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $716 $2,600 Not Implemented
AS0279 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $858 $60 Implemented
AS0279 # 04 Y:2000 04 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,610 $3,800 Not Implemented
AS0279 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,223 $3,800 Not Implemented
AS0279 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,961 $8,285 Not Implemented
AS0279 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,617 $1,591 Not Implemented
AS0279 # 08 Y:2000 08 2000 INSTALL TIMERS AND/OR THERMOSTATS $573 $600 Not Implemented
AS0279 # 09 Y:2000 09 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,632 $120 Not Implemented
AS0279 # 10 Y:2000 10 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $421 $110 Implemented
AS0279 # 11 Y:2000 11 2000 $28,870 $4,880 Implemented
AR0184 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $544 $413 Not Implemented
AR0184 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,142 $6,340 Not Implemented
AR0184 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $743 $1,378 Not Implemented
AR0184 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,102 $500 Not Implemented
AR0184 # 05 Y:2000 05 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,529 $1,550 Not Implemented