IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

384

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0499 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Implemented
CO0499 # 04 Y:2002 04 2002 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $540 $900 Implemented
CO0499 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $610 $260 Implemented
CO0499 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,480 $7,000 Implemented
CO0499 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,240 $84,240 Not Implemented
CO0497 # 08 Y:2001 08 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,760 $250 Implemented
CO0497 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $87,600 $6,280 Implemented
CO0497 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0497 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $770 $430 Implemented
CO0497 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,230 $440 Implemented
CO0497 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,470 $7,170 Implemented
CO0497 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,610 $22,110 Implemented
CO0497 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,250 $12,000 n/a
CO0456 # 09 Y:2000 09 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,850 $250 n/a
CO0456 # 08 Y:2000 08 2000 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $31,200 $25,000 n/a
CO0456 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $130 $0 n/a
CO0456 # 06 Y:2000 06 2000 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $407,670 $10,000 n/a
CO0456 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $0 n/a
CO0456 # 04 Y:2000 04 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $930 $1,400 n/a
CO0456 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,910 $4,030 n/a
CO0456 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $470 n/a
CO0456 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $5,620 $15,400 n/a
CO0449 # 09 Y:1999 09 1999 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $8,960 $620 Implemented
CO0449 # 08 Y:1999 08 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,160 $3,300 Implemented
CO0449 # 07 Y:1999 07 1999 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $2,550 $1,100 Implemented