IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

651

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0377 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $1,242 $1,042 Not Implemented
MI0377 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,479 $1,875 Not Implemented
MI0377 # 06 Y:2020 06 2020 AIR CONDITION ONLY SPACE NECESSARY $1,976 $4,415 Not Implemented
MI0377 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,125 $2,048 Not Implemented
MI0377 # 04 Y:2020 04 2020 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,560 $17,760 Not Implemented
MI0377 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,058 $1,306 Not Implemented
MI0377 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,215 $2,100 Not Implemented
MI0377 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,975 $1,980 Not Implemented
UF0531 # 06 Y:2019 06 2019 UPGRADE CONTROLS ON COMPRESSORS $1,675 $667 Implemented
UF0531 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $2,072 $195 Implemented
UF0531 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $2,473 $7,866 Implemented
UF0531 # 03 Y:2019 03 2019 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $17,787 $43,500 Implemented
UF0531 # 02 Y:2019 02 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $18,581 $89,000 Implemented
UF0531 # 01 Y:2019 01 2019 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $19,490 $2,150 Implemented
UF0525 # 09 Y:2019 09 2019 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $34,636 $10,000 Not Implemented
UF0525 # 08 Y:2019 08 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $35,380 $15,216 Not Implemented
UF0525 # 07 Y:2019 07 2019 ISOLATE HOT OR COLD EQUIPMENT $1,061 $2,108 Not Implemented
UF0525 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,312 $464 Implemented
UF0525 # 05 Y:2019 05 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,145 $3,960 Implemented
UF0525 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,084 $4,798 Implemented
UF0525 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,245 $18,331 Implemented
UF0525 # 02 Y:2019 02 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,500 $33,800 Not Implemented
UF0525 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,580 $31,585 Implemented
UF0524 # 09 Y:2019 09 2019 TREAT AND REUSE RINSE WATERS $17,615 $0 Implemented
UF0524 # 08 Y:2019 08 2019 ISOLATE HOT OR COLD EQUIPMENT $4,945 $5,090 Not Implemented