IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,026

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0172 # 08 Y:1996 08 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $30,874 $38,200 Not Implemented
AS0172 # 09 Y:1996 09 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,620 $8,092 Not Implemented
AS0172 # 10 Y:1996 10 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,393 $0 Not Implemented
NV0055 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $86 $63 Not Implemented
NV0055 # 02 Y:1996 02 1996 USE POWER DURING OFF-PEAK PERIODS $3,340 $0 Not Implemented
NV0055 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,239 $200 Implemented
NV0055 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,970 $1,600 Not Implemented
NV0055 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $480 $0 Not Implemented
NV0055 # 06 Y:1996 06 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,395 $4,000 Not Implemented
NV0055 # 07 Y:1996 07 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,080 $8,170 Not Implemented
IA0142 # 01 Y:1996 01 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,323 $0 Not Implemented
IA0142 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,297 $63 Implemented
IA0142 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $262 Implemented
IA0142 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $900 $1,362 Implemented
IA0142 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $444 Implemented
IA0142 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $466 $92 Not Implemented
IA0142 # 07 Y:1996 07 1996 ELIMINATE/REDUCE AN OPERATION $653 $574 Not Implemented
WI0265 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,546 $60,000 Implemented
WI0265 # 02 Y:1996 02 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,889 $0 Not Implemented
WI0265 # 03 Y:1996 03 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,667 $8,000 Not Implemented
WI0265 # 04 Y:1996 04 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $6,626 $27,600 Not Implemented
WI0265 # 05 Y:1996 05 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,490 $6,500 Implemented
WI0265 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,039 $6,400 Implemented
WI0265 # 07 Y:1996 07 1996 RECOVER AND REUSE COOLING WATER $1,750 $6,000 Not Implemented
WI0265 # 08 Y:1996 08 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $954 $4,000 Not Implemented