Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 1996 |
Principal Product | Plastic Parts |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 86 |
Plant Area (Sq.Ft.) | 32,000 |
Annual Production | 1,500,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $132,144 | 3,199,883 | kWh | $0.04 |
Electricity Demand | $78,050 | 6,411 | kW-months/year | $12.17 |
Electricity Fees | $2,197 | - | $ | - |
Natural Gas | $5,821 | 1,515 | MMBtu | $3.84 |
TOTAL ENERGY COSTS | $242,212 | |||
RECOMMENDED SAVINGS* | $150,805 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $145,658 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $44,073 Cost: $2,850 |
$30,836 | 793,962 | $13,237 | 1,088 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$30,836 793,962 kWh |
$13,237 1,088 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $17,093 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $17,093 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$17,093 - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $11,783 Cost: $12,980 |
$8,312 | 201,348 | $3,471 | 285 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$8,312 201,348 kWh |
$3,471 285 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $5,328 Cost: $580 |
$3,512 | 84,994 | $1,418 | 117 | - | - | - | - | - | - | $44 | - | - | - | $354 | - | - | - |
$3,512 84,994 kWh |
$1,418 117 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$44 - $ |
- - $ |
$354 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,319 Cost: $5,805 |
$1,975 | 47,773 | $849 | 70 | - | - | - | - | - | - | $73 | - | - | - | $422 | - | - | - |
$1,975 47,773 kWh |
$849 70 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$73 - $ |
- - $ |
$422 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,522 Cost: $1,125 |
$1,691 | 37,515 | $831 | 68 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$1,691 37,515 kWh |
$831 68 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $915 Cost: $1,180 |
$866 | 21,102 | $349 | 29 | $(-300) | (-89) | - | - | - | - | - | - | - | - | - | - | - | - |
$866 21,102 kWh |
$349 29 kW-months/year |
$(-300) (-89) MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $863 Cost: $522 |
$615 | 14,947 | $248 | 20 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$615 14,947 kWh |
$248 20 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $519 Cost: $1,515 |
- | - | - | - | $519 | 154 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$519 154 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $394 Cost: $391 |
$251 | 5,275 | $143 | 12 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$251 5,275 kWh |
$143 12 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $56,426 Cost: $1,500 |
$(-500) | (-12,016) | - | - | - | - | - | - | $4,514 | 31,025 | $(-6,225) | - | - | - | $58,637 | - | - | - |
$(-500) (-12,016) kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$4,514 31,025 lb |
$(-6,225) - $ |
- - $ |
$58,637 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $6,360 Cost: $6,750 |
- | - | - | - | - | - | - | - | - | - | - | - | $6,360 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$6,360 - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,210 Cost: $500 |
- | - | - | - | - | - | $523 | 153,300 | - | - | - | - | - | - | - | - | $687 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$523 153,300 Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
$687 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $150,805 Cost: $35,698 |
$47,558 | 1,194,900 | $20,546 | 1,689 | $219 | 65 | $523 | 153,300 | $4,514 | 31,025 | $(-6,108) | - | $23,453 | - | $59,413 | - | $687 | - | $47,558 1,194,900 kWh |
$20,546 1,689 kW-months/year |
$219 65 MMBtu |
$523 153,300 Tgal |
$4,514 31,025 lb |
$(-6,108) - $ |
$23,453 - $ |
$59,413 - $ |
$687 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $145,658 Cost: $26,807 |
$44,466 | 1,120,750 | $19,205 | 1,578 | - | - | $523 | 153,300 | $4,514 | 31,025 | $(-6,181) | - | $23,453 | - | $58,991 | - | $687 | - | $44,466 1,120,750 kWh |
$19,205 1,578 kW-months/year |
- - MMBtu |
$523 153,300 Tgal |
$4,514 31,025 lb |
$(-6,181) - $ |
$23,453 - $ |
$58,991 - $ |
$687 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Water Consumption |