IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0069 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,000 $45,000 Implemented
NC0069 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $388 $300 Implemented
NC0069 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $580 $588 Not Implemented
NC0069 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $192 $168 Implemented
NC0069 # 05 Y:1995 05 1995 REDUCE VENTILATION AIR $782 $1,250 Not Implemented
NC0069 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $538 $864 Not Implemented
NC0069 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,681 $40,000 Not Implemented
NC0069 # 08 Y:1995 08 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,888 $7,500 Implemented
NC0069 # 09 Y:1995 09 1995 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $5,434 $7,200 Not Implemented
MA0346 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,905 $100,000 Not Implemented
MA0346 # 02 Y:1995 02 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $7,124 $30,000 Not Implemented
MA0346 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,744 $810 Not Implemented
MA0346 # 04 Y:1995 04 1995 REPAIR OR REPLACE STEAM TRAPS $619 $300 Not Implemented
MA0346 # 05 Y:1995 05 1995 USE MINIMUM STEAM OPERATING PRESSURE $552 $1,160 Not Implemented
MA0346 # 06 Y:1995 06 1995 CLOSE OFF UNNEEDED STEAM LINES $333 $0 Not Implemented
MA0346 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $700 Not Implemented
MA0346 # 08 Y:1995 08 1995 REDUCE SCRAP PRODUCTION $40,068 $56,350 Not Implemented
MA0346 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $14,227 $25,000 Not Implemented
AM0251 # 01 Y:1995 01 1995 USE POWER DURING OFF-PEAK PERIODS $26,060 $1,980 Implemented
AM0251 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $2,370 Not Implemented
AM0251 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,420 $1,110 Implemented
AM0251 # 04 Y:1995 04 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,660 $0 Implemented
AM0251 # 05 Y:1995 05 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,330 $0 Implemented
AM0251 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $550 Implemented
AM0251 # 07 Y:1995 07 1995 USE SYNTHETIC LUBRICANT $410 $0 Implemented