IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16,937

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1013 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $9,464 $1,012 Not Implemented
UD1013 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $768 $203 Not Implemented
UD1013 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,951 $5,000 Implemented
UD1013 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,346 $1,000 Implemented
UD1013 # 07 Y:2020 07 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $792 $600 Not Implemented
UD1013 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,239 $14,500 Implemented
UD1013 # 09 Y:2020 09 2020 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,053 $1,800 Not Implemented
UD1013 # 10 Y:2020 10 2020 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,681 $21,000 Not Implemented
LS2005 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,727 $300 Not Implemented
LS2005 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,560 $0 Implemented
LS2005 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $114 $50 Not Implemented
LS2005 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,208 $17,766 Not Implemented
LS2005 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $274 $0 Implemented
LS2005 # 06 Y:2020 06 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $225,476 $1,204,486 Not Implemented
IC0233 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $329 $167 Not Implemented
IC0233 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $167 Not Implemented
IC0233 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,788 $861 Not Implemented
IC0233 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,778 $2,589 Not Implemented
MA0814 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $89,868 $533,354 Not Implemented
MA0814 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,091 $65,600 Not Implemented
MA0814 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,887 $69,625 Not Implemented
MA0814 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,788 $12,100 Implemented
MA0814 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,694 $12,100 Implemented
MA0814 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,857 $4,096 Implemented
WV0589 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,897 $154,350 Not Implemented