IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0073 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,897 $18,400 Implemented
IA0073 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,317 $730 Not Implemented
IA0073 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $467 $0 Not Implemented
IA0073 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $456 $150 Not Implemented
IA0073 # 05 Y:1994 05 1994 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $1,745 $9,000 Implemented
IA0073 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $1,319 $855 Implemented
IA0073 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,254 $862 Implemented
IA0073 # 08 Y:1994 08 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $212 $70 Not Implemented
IA0073 # 09 Y:1994 09 1994 OPTIMIZE PLANT POWER FACTOR $1,451 $4,140 Implemented
SF0015 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,029 $9,608 Implemented
SF0015 # 02 Y:1993 02 1993 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,821 $20,000 Not Implemented
SF0015 # 03 Y:1993 03 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,452 $1,650 Implemented
SF0015 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $2,119 $1,068 Not Implemented
SF0015 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $1,767 $1,062 Implemented
SF0015 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,540 $400 Implemented
SF0015 # 07 Y:1993 07 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $1,416 $906 Implemented
SF0015 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,406 $3,719 Implemented
SF0015 # 09 Y:1993 09 1993 USE SYNTHETIC LUBRICANT $1,098 $0 Implemented
SF0015 # 10 Y:1993 10 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,030 $1,824 Implemented
SF0015 # 11 Y:1993 11 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $612 $162 Implemented
OK0419 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,780 $23,320 Not Implemented
OK0419 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,934 $15,211 Not Implemented
OK0419 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,338 $0 Implemented
OK0419 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,331 $6,008 Not Implemented
OK0419 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,053 $3,174 Not Implemented