IAC logo
IAC Assessment: UF0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1994
Principal Product Plastic
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 37,500
Annual Production 5,000,000 Pounds
Production Hrs. Annual 5,950
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,825 2,327,081 kWh $0.06
Other Energy $30,406 4,274 MMBtu $7.11
TOTAL ENERGY COSTS $180,231
RECOMMENDED SAVINGS* $110,104 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,944
#|Description Savings
Cost
Status Electricity Usage Primary Product Electricity Usage Primary Product
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,610
Cost:
$5,358
$2,610 38,687 - - $2,610
38,687
kWh
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$165
Cost:
$228
$165 3,810 - - $165
3,810
kWh
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,247
Cost:
$1,883
$3,247 51,583 - - $3,247
51,583
kWh
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,087
Cost:
$1,100
$3,087 48,945 - - $3,087
48,945
kWh
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$496
Cost:
$1,200
$496 5,862 - - $496
5,862
kWh
-
-
$
06: 4.631 INSTALL AN UNINTERUPTABLE POWER SUPPLY Savings:
$100,000
Cost:
$8,200
- - $100,000 - -
-
kWh
$100,000
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$499
Cost:
$244
$499 20,809 - - $499
20,809
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$110,104
Cost:
$18,213
$10,104 169,696 $100,000 - $10,104
169,696
kWh
$100,000
-
$
TOTAL IMPLEMENTED Savings:
$8,944
Cost:
$8,341
$8,944 139,215 - - $8,944
139,215
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Primary Product Electricity Usage Primary Product