IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0063 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,268 $7,024 Not Implemented
AS0063 # 11 Y:1992 11 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $300 Not Implemented
UD0376 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,478 $0 Implemented
UD0376 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,160 $0 Implemented
UD0376 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $556 $0 Implemented
UD0376 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $7,731 $0 Not Implemented
UD0376 # 05 Y:1992 05 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,390 $30,000 Not Implemented
OR0148 # 01 Y:1992 01 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $942 $0 Implemented
OR0148 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $86 $0 Implemented
OR0148 # 03 Y:1992 03 1992 MINIMIZE WATER USAGE $1,770 $574 Not Implemented
OR0148 # 04 Y:1992 04 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,487 $2,700 Implemented
OR0148 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $934 $1,000 Implemented
OR0148 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $516 $1,090 Not Implemented
OR0148 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $544 $228 Implemented
SD0023 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,038 $575 Not Implemented
SD0023 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,980 $2,000 Not Implemented
SD0023 # 03 Y:1992 03 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $654 $15 Not Implemented
SD0023 # 04 Y:1992 04 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $490 $245 Not Implemented
SD0023 # 05 Y:1992 05 1992 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $1,061 $2,160 Not Implemented
SD0023 # 06 Y:1992 06 1992 REPAIR OR REPLACE STEAM TRAPS $12,496 $830 Not Implemented
SD0023 # 07 Y:1992 07 1992 REPAIR AND ELIMINATE STEAM LEAKS $9,999 $200 Not Implemented
SD0023 # 08 Y:1992 08 1992 INSTALL SET-BACK TIMERS $3,070 $4,050 Not Implemented
SD0023 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,607 $0 Not Implemented
SD0023 # 10 Y:1992 10 1992 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,353 $200 Not Implemented
MA0245 # 01 Y:1992 01 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,316 $0 Not Implemented