IAC Assessment: WI0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1993
Principal Product Rubber electrical components
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 43
Plant Area (Sq.Ft.) 33,000
Annual Production 40,000 Pounds
Production Hrs. Annual 2,125
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,934 1,581,770 kWh $0.06
Natural Gas $49,622 17,875 MMBtu $2.78
TOTAL ENERGY COSTS $149,556
RECOMMENDED SAVINGS* $6,865 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,646
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,008
Cost:
$500
- - $3,008 1,082 -
-
kWh
$3,008
1,082
MMBtu
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$928
Cost:
$1,400
$928 14,654 - - $928
14,654
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$638
Cost:
$800
$638 9,965 - - $638
9,965
kWh
-
-
MMBtu
04: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$521
Cost:
$1,482
- - $521 187 -
-
kWh
$521
187
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$520
Cost:
$700
- - $520 187 -
-
kWh
$520
187
MMBtu
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$448
Cost:
-
$448 - - - $448
-
kWh
-
-
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$377
Cost:
$700
$463 7,327 $(-86) (-31) $463
7,327
kWh
$(-86)
(-31)
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$235
Cost:
$352
$235 3,810 - - $235
3,810
kWh
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$190
Cost:
$640
$190 2,931 - - $190
2,931
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,865
Cost:
$6,574
$2,902 38,687 $3,963 1,425 $2,902
38,687
kWh
$3,963
1,425
MMBtu
TOTAL IMPLEMENTED Savings:
$3,646
Cost:
$1,140
$638 2,931 $3,008 1,082 $638
2,931
kWh
$3,008
1,082
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas