IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0117 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $552 $135 Implemented
SD0002 # 01 Y:1991 01 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,725 $3,100 Implemented
SD0002 # 02 Y:1991 02 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $11,147 $300 Implemented
SD0002 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,086 $5,550 Implemented
SD0002 # 04 Y:1991 04 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $580 $600 Implemented
SD0002 # 05 Y:1991 05 1991 KEEP LAMPS AND REFLECTORS CLEAN $752 $3,780 Implemented
OR0118 # 01 Y:1991 01 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,432 $0 Implemented
OR0118 # 02 Y:1991 02 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,838 $0 Implemented
OR0118 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $3,367 $3,124 Implemented
OR0118 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $383 $919 Implemented
OR0118 # 05 Y:1991 05 1991 OPTIMIZE PLANT POWER FACTOR $2,040 $5,100 Implemented
OR0118 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $1,177 Implemented
RU0115 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,350 $0 Implemented
RU0115 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,064 $87 Implemented
RU0115 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,353 $800 Implemented
RU0115 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,855 $201 Implemented
RU0115 # 05 Y:1991 05 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,087 $6,840 Implemented
RU0115 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,343 $0 Implemented
RU0115 # 07 Y:1991 07 1991 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,041 $2,700 Implemented
RU0115 # 08 Y:1991 08 1991 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $5,372 $875 Implemented
UD0345 # 01 Y:1991 01 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,172 $20,000 Not Implemented
UD0345 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $354 $800 Not Implemented
UD0345 # 03 Y:1991 03 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $964 $0 Not Implemented
UD0345 # 04 Y:1991 04 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,540 $720 Not Implemented
CO0214 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,100 $5,700 Not Implemented