IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0093 # 02 Y:1990 02 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,837 $16,000 Not Implemented
WI0093 # 03 Y:1990 03 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $10,055 $500 Implemented
WI0093 # 04 Y:1990 04 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,011 $1,600 Not Implemented
WI0093 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,748 $758 Implemented
WI0093 # 06 Y:1990 06 1990 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,820 $0 Implemented
WI0093 # 07 Y:1990 07 1990 INSTALL TIMERS AND/OR THERMOSTATS $147 $1,000 Implemented
WI0093 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,082 $1,600 Implemented
MA0185 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $9,738 $10,200 Implemented
MA0185 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,358 $0 Not Implemented
MA0185 # 03 Y:1990 03 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $334 $180 Implemented
MA0185 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $471 Implemented
OR0085 # 01 Y:1990 01 1990 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $112,370 $38,400 Implemented
OR0085 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,965 $2,806 Implemented
OR0085 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $389 $240 Not Implemented
OR0085 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $483 $909 Implemented
OR0085 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $747 $1,385 Not Implemented
OR0085 # 06 Y:1990 06 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,647 $7,200 Not Implemented
UD0319 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,147 $0 Implemented
UD0319 # 02 Y:1990 02 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,320 $0 Implemented
UD0319 # 03 Y:1990 03 1990 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $13,053 $0 Implemented
UD0319 # 04 Y:1990 04 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,790 $0 Implemented
AS0005 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,187 $250 Not Implemented
AS0005 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,723 $310 Not Implemented
AS0005 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $550 $729 Not Implemented
MA0180 # 01 Y:1990 01 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,523 $5,750 Implemented