IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0037 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $775 $96 Implemented
RU0037 # 04 Y:1988 04 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,970 $4,500 Implemented
RU0037 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $719 $3,556 Not Implemented
RU0037 # 06 Y:1988 06 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $392 $500 Not Implemented
RU0040 # 01 Y:1988 01 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,115 $412 Implemented
RU0040 # 02 Y:1988 02 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,463 $0 Implemented
RU0040 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $7,613 $4,000 Not Implemented
RU0040 # 04 Y:1988 04 1988 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $150,077 $375,000 Not Implemented
RU0040 # 05 Y:1988 05 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,098 $0 Implemented
LT0130 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $859 $600 Implemented
LT0130 # 02 Y:1988 02 1988 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $398 $230 Not Implemented
LT0130 # 03 Y:1988 03 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,270 $0 Implemented
LT0130 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $3,190 $1,625 Not Implemented
LT0130 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,450 $1,781 Not Implemented
LT0130 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,810 $0 Implemented
LT0130 # 07 Y:1988 07 1988 INSTALL TIMERS AND/OR THERMOSTATS $590 $300 Implemented
LT0130 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,734 $183 Not Implemented
LT0132 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $1,820 $1,967 Implemented
LT0132 # 02 Y:1988 02 1988 REDESIGN PROCESS $23,180 $3,057 Not Implemented
LT0132 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $352 $855 Not Implemented
LT0132 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $256 $300 Implemented
LT0132 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50 $120 Not Implemented
LT0132 # 06 Y:1988 06 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,500 $150 Not Implemented
LT0132 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $4,000 $3,680 Not Implemented
KU0269 # 01 Y:1988 01 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $17,859 $10,000 Not Implemented