Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,096
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0237 # 09 Y:1987 | 09 | 1987 | RECOVER AND REUSE COOLING WATER | $2,400 | $4,000 | Implemented |
KU0228 # 01 Y:1987 | 01 | 1987 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $16,760 | $0 | Not Implemented |
KU0228 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,815 | $14,465 | Implemented |
KU0228 # 03 Y:1987 | 03 | 1987 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,841 | $0 | Implemented |
KU0228 # 04 Y:1987 | 04 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,401 | $700 | Implemented |
KU0228 # 05 Y:1987 | 05 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,064 | $0 | Implemented |
KU0228 # 06 Y:1987 | 06 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $1,550 | $700 | Not Implemented |
KU0228 # 07 Y:1987 | 07 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $919 | $1,700 | Implemented |
KU0228 # 08 Y:1987 | 08 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $873 | $50 | Not Implemented |
KU0228 # 09 Y:1987 | 09 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $153 | $0 | Implemented |
GT0324 # 01 Y:1987 | 01 | 1987 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $170 | $0 | Implemented |
GT0324 # 02 Y:1987 | 02 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,980 | $0 | Not Implemented |
GT0324 # 03 Y:1987 | 03 | 1987 | INSULATE BARE EQUIPMENT | $2,990 | $1,400 | Implemented |
GT0324 # 04 Y:1987 | 04 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,078 | $17,060 | Not Implemented |
GT0324 # 05 Y:1987 | 05 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,220 | $1,780 | Implemented |
GT0324 # 06 Y:1987 | 06 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $520 | $1,883 | Implemented |
LT0085 # 01 Y:1987 | 01 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,100 | $2,000 | Not Implemented |
LT0085 # 02 Y:1987 | 02 | 1987 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $290 | $333 | Implemented |
LT0085 # 03 Y:1987 | 03 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $103 | $202 | Implemented |
OK0229 # 01 Y:1987 | 01 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $114 | $0 | Implemented |
OK0229 # 02 Y:1987 | 02 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $577 | $0 | Not Implemented |
OK0229 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $433 | $0 | Implemented |
OK0229 # 04 Y:1987 | 04 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,236 | $1,031 | Implemented |
OK0229 # 05 Y:1987 | 05 | 1987 | OPTIMIZE PLANT POWER FACTOR | $3,708 | $2,200 | Implemented |
OK0229 # 06 Y:1987 | 06 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,856 | $1,100 | Not Implemented |