Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1988
Principal Product PVC SIDING
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 30,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $251,765 6,286,929 kWh $0.04
Natural Gas $12,894 3,195 MMBtu $4.04
TOTAL ENERGY COSTS $264,659
RECOMMENDED SAVINGS* $42,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,959
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,030
Cost:
$500
$2,030 50,703 $2,030
50,703
kWh
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,114
Cost:
$1,550
$1,114 27,843 $1,114
27,843
kWh
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$21,888
Cost:
$2,000
$21,888 546,893 $21,888
546,893
kWh
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,971
Cost:
-
$1,971 49,238 $1,971
49,238
kWh
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$12,051
Cost:
-
$12,051 - $12,051
-
kWh
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,642
Cost:
$1,100
$1,642 41,032 $1,642
41,032
kWh
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,314
Cost:
$250
$1,314 32,825 $1,314
32,825
kWh
TOTAL RECOMMENDED Savings:
$42,010
Cost:
$5,400
$42,010 748,534 $42,010
748,534
kWh
TOTAL IMPLEMENTED Savings:
$29,959
Cost:
$5,400
$29,959 748,534 $29,959
748,534
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage