IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,583

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0541 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,995 $4,078 Implemented
SD0541 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $976 $324 Implemented
SD0541 # 05 Y:2016 05 2016 UPGRADE CONTROLS ON COMPRESSORS $13,025 $17,000 Implemented
SD0541 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,362 $200 Not Implemented
SD0541 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,385 $2,800 Implemented
SD0541 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,632 $12,913 Implemented
SD0541 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $6,061 $14,800 Implemented
SD0541 # 10 Y:2016 10 2016 INSTALL TIMERS AND/OR THERMOSTATS $7,037 $270 Implemented
SD0541 # 11 Y:2016 11 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,842 $1,098 Implemented
SF0479 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $210 Implemented
SF0479 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $796 $70 Not Implemented
SF0479 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,397 $4,166 Implemented
SF0479 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $846 $2,490 Implemented
SF0479 # 05 Y:2016 05 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $24,263 $204,396 Not Implemented
SD0523 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $38,152 $147,781 Implemented
SD0523 # 02 Y:2016 02 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,463 $69,877 Implemented
SD0523 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,883 $11,174 Implemented
SD0523 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,728 $24,400 Implemented
SD0523 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,236 $1,000 Implemented
SD0523 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,188 $1,500 Implemented
SD0523 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,341 $700 Implemented
SD0523 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,304 $3,171 Implemented
SD0523 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $845 $36 Implemented
SD0521 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,923 $80,120 Not Implemented
SD0521 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,324 $35,903 Not Implemented