Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,096
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0986 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $37,147 | $0 | Not Implemented |
UD0986 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $467 | $0 | Not Implemented |
UD0986 # 05 Y:2018 | 05 | 2018 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $455 | $0 | Not Implemented |
UD0986 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,962 | $2,000 | Not Implemented |
UD0986 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,246 | $2,080 | Not Implemented |
UD0986 # 08 Y:2018 | 08 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $353 | $50 | Not Implemented |
UD0986 # 09 Y:2018 | 09 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $193 | $500 | Not Implemented |
UD0986 # 10 Y:2018 | 10 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,539 | $17,808 | Not Implemented |
IC0204 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $71,958 | $100,000 | Implemented |
IC0204 # 02 Y:2018 | 02 | 2018 | ADJUST PH FOR NEUTRALIZATION | $132,488 | $180,000 | Implemented |
IC0204 # 03 Y:2018 | 03 | 2018 | REPLACE BOILER | $97,199 | $211,342 | Implemented |
IC0204 # 04 Y:2018 | 04 | 2018 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $71,357 | $8,712 | Implemented |
IC0204 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,223 | $0 | Implemented |
IC0204 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $36,108 | $187,206 | Implemented |
LE0454 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,723 | $1,500 | Implemented |
LE0454 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $554 | $300 | Implemented |
LE0454 # 03 Y:2018 | 03 | 2018 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $40,361 | $48,000 | Implemented |
LE0454 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,821 | $20,500 | Not Implemented |
LE0454 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,855 | $8,000 | Implemented |
LE0454 # 06 Y:2018 | 06 | 2018 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $9,261 | $28,000 | Not Implemented |
LE0454 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,301 | $23,000 | Implemented |
LE0454 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $895 | $4,400 | Implemented |
OK0985 # 01 Y:2018 | 01 | 2018 | INSTALL SET-BACK TIMERS | $758 | $592 | Not Implemented |
OK0985 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,240 | $19,498 | Implemented |
OK0985 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,769 | $21,562 | Implemented |