IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

224

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0391 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,800 $5,200 Implemented
TN0391 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,950 $1,800 Implemented
TN0391 # 04 Y:1990 04 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,420 $2,780 Implemented
TN0391 # 05 Y:1990 05 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $465 $3,000 Not Implemented
TN0391 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $1,421 $263 Not Implemented
TN0391 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $577 $350 Not Implemented
TN0391 # 08 Y:1990 08 1990 INSULATE BARE EQUIPMENT $360 $512 Implemented
TN0391 # 09 Y:1990 09 1990 OPTIMIZE PLANT POWER FACTOR $6,781 $25,000 Implemented
UD0261 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,051 $0 Not Implemented
UD0261 # 02 Y:1988 02 1988 RECOVER AND REUSE COOLING WATER $3,120 $6,000 Implemented
UD0261 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,080 $0 Implemented
UD0262 # 01 Y:1988 01 1988 OPTIMIZE PLANT POWER FACTOR $13,844 $17,000 Implemented
UD0262 # 02 Y:1988 02 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $794 $60 Not Implemented
UD0262 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $6,565 $18,000 Not Implemented
UD0262 # 04 Y:1988 04 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,829 $0 Not Implemented
UD0262 # 05 Y:1988 05 1988 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $7,880 $5,000 Not Implemented
TN0293 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $13,716 $2,811 Implemented
TN0293 # 02 Y:1986 02 1986 USE OPTIMUM THICKNESS INSULATION $1,969 $500 Not Implemented
TN0293 # 03 Y:1986 03 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,536 $0 Not Implemented
TN0293 # 04 Y:1986 04 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,798 $500 Not Implemented
TN0293 # 05 Y:1986 05 1986 TURN OFF EQUIPMENT WHEN NOT IN USE $640 $0 Implemented
TN0293 # 06 Y:1986 06 1986 TURN OFF EQUIPMENT WHEN NOT IN USE $625 $500 Not Implemented
TN0293 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $625 $180 Implemented
TN0293 # 08 Y:1986 08 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $300 Not Implemented