Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0555 # 03 Y:1998 | 03 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,281 | $0 | Implemented |
OK0555 # 13 Y:1998 | 13 | 1998 | INSTALL OCCUPANCY SENSORS | $899 | $585 | Not Implemented |
OK0555 # 12 Y:1998 | 12 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,948 | $1,080 | Not Implemented |
OK0555 # 11 Y:1998 | 11 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,573 | $5,000 | Not Implemented |
OK0555 # 10 Y:1998 | 10 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,823 | $2,100 | Implemented |
OK0555 # 09 Y:1998 | 09 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,002 | $320 | Implemented |
OK0555 # 08 Y:1998 | 08 | 1998 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $5,557 | $25,000 | Not Implemented |
OK0555 # 07 Y:1998 | 07 | 1998 | OPTIMIZE PLANT POWER FACTOR | $6,214 | $1,483 | Not Implemented |
OK0555 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,825 | $0 | Implemented |
OK0555 # 05 Y:1998 | 05 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,911 | $5,543 | Not Implemented |
OK0555 # 04 Y:1998 | 04 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $9,562 | $9,700 | Implemented |
OK0555 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $2,417 | $39,746 | Implemented |
OK0555 # 01 Y:1998 | 01 | 1998 | REDESIGN PROCESS | $178,358 | $248,000 | Implemented |
OK0539 # 01 Y:1998 | 01 | 1998 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $33,669 | $117,000 | Not Implemented |
OK0539 # 08 Y:1998 | 08 | 1998 | $20,600 | $14,000 | Not Implemented | |
OK0539 # 07 Y:1998 | 07 | 1998 | $69,300 | $0 | Implemented | |
OK0539 # 06 Y:1998 | 06 | 1998 | METER WASTE WATER | $885 | $0 | Not Implemented |
OK0539 # 05 Y:1998 | 05 | 1998 | FILTER AND REUSE HYDRAULIC OIL | $6,430 | $18,790 | Not Implemented |
OK0539 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $949 | $90 | Not Implemented |
OK0539 # 03 Y:1998 | 03 | 1998 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,678 | $5,722 | Not Implemented |
OK0539 # 02 Y:1998 | 02 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,052 | $15,600 | Implemented |