IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,146

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0892 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $255 $1,000 n/a
AM0892 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $15,525 $136,100 n/a
AM0892 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $711 $506 n/a
AM0892 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $248 $800 n/a
AM0882 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $635 $0 Implemented
AM0882 # 07 Y:2023 07 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $310 $90 Implemented
AM0882 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $435 $1,900 Implemented
AM0882 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $360 $290 Implemented
AM0882 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,699 $5,000 Implemented
AM0882 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $900 $0 Implemented
AM0882 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,185 $690 Implemented
TR0041 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,679 $3,857 n/a
TR0041 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $28,659 $27,941 n/a
TR0041 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $17,496 $200,000 n/a
TR0037 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $210,765 $1,396,349 Not Implemented
TR0037 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,104 $9,500 Implemented
TR0037 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,441 $10,000 Not Implemented
TR0037 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $62,708 $9,722 Implemented
TR0040 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,078 $15,000 Implemented
TR0040 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $11,309 $128,100 Not Implemented
TR0037 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,119 $1,204 Implemented
TR0040 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $4,166 Implemented
AM0877 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,440 $105 Implemented
AM0877 # 06 Y:2023 06 2023 USE SYNTHETIC LUBRICANT $7,230 $675 Not Implemented
AM0877 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,900 $60,360 Implemented