IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

601

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0449 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,532 $0 Implemented
UD0449 # 04 Y:1994 04 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,258 $0 Implemented
UD0449 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,815 $0 Implemented
UD0449 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,945 $250 Implemented
UD0449 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,846 $4,234 Not Implemented
UD0449 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,439 $0 Implemented
KG0015 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,824 $2,390 Not Implemented
KG0015 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $799 $15 Implemented
KG0015 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $407 $162 Implemented
KG0015 # 04 Y:1994 04 1994 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,458 $2,300 Not Implemented
KG0015 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,992 $0 Implemented
KG0015 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $3,720 $118 Not Implemented
AM0224 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,090 $1,000 Implemented
AM0224 # 02 Y:1994 02 1994 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $425 $0 Implemented
AM0224 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $355 $126 Implemented
AM0224 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70 $26 Implemented
SF0044 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $748 $837 Implemented
SF0044 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,174 $832 Not Implemented
SF0044 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,035 $5,600 Not Implemented
SF0044 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $194 $223 Implemented
SF0044 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,511 $2,628 Implemented
SF0044 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,306 $900 Implemented
SF0044 # 01 Y:1994 01 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,307 $5,375 Not Implemented
NV0007 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $1,970 $6,450 Not Implemented
NV0007 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,382 $880 Not Implemented