IAC logo
IAC Assessment: UD0449
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0449
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1994
Principal Product plastic containers
NAICS n/a
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 27,000
Annual Production 71,700,000 Pieces
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $462,378 9,552,169 kWh $0.05
Natural Gas $12,849 2,278 MMBtu $5.64
TOTAL ENERGY COSTS $475,227
RECOMMENDED SAVINGS* $46,835 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,989
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$19,945
Cost:
$250
$19,945 350,234 - - $19,945
350,234
kWh
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,532
Cost:
-
$2,532 - - - $2,532
-
kWh
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,439
Cost:
-
$8,439 - - - $8,439
-
kWh
-
-
$
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$2,258
Cost:
-
$1,758 82,649 $500 - $1,758
82,649
kWh
$500
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$11,815
Cost:
-
$11,815 - - - $11,815
-
kWh
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,846
Cost:
$4,234
$1,846 33,411 - - $1,846
33,411
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$46,835
Cost:
$4,484
$46,335 466,294 $500 - $46,335
466,294
kWh
$500
-
$
TOTAL IMPLEMENTED Savings:
$44,989
Cost:
$250
$44,489 432,883 $500 - $44,489
432,883
kWh
$500
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes