Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
609
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0572 # 02 Y:1995 | 02 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,560 | $1,190 | Implemented |
GT0572 # 01 Y:1995 | 01 | 1995 | REDESIGN PROCESS | $7,850 | $1,000 | Implemented |
GT0572 # 03 Y:1995 | 03 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,350 | $1,000 | Not Implemented |
GT0572 # 04 Y:1995 | 04 | 1995 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,550 | $6,400 | Not Implemented |
GT0572 # 05 Y:1995 | 05 | 1995 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,530 | $9,020 | Implemented |
CO0350 # 03 Y:1995 | 03 | 1995 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,300 | $250 | Implemented |
CO0350 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $910 | $0 | Not Implemented |
CO0350 # 01 Y:1995 | 01 | 1995 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,810 | $0 | Implemented |
CO0350 # 06 Y:1995 | 06 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $290 | $610 | Not Implemented |
CO0350 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,580 | $290 | Implemented |
CO0350 # 04 Y:1995 | 04 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $870 | $30 | Not Implemented |
GT0571 # 01 Y:1995 | 01 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $110 | $300 | Not Implemented |
GT0571 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $890 | $2,700 | Not Implemented |
GT0571 # 04 Y:1995 | 04 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,620 | $2,500 | Not Implemented |
GT0571 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,500 | $10,000 | Not Implemented |
GT0571 # 03 Y:1995 | 03 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $470 | $300 | Not Implemented |
GT0571 # 06 Y:1995 | 06 | 1995 | ADD AREA LIGHTING SWITCHES | $70 | $150 | Not Implemented |
HO0121 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,049 | $160 | Implemented |
HO0121 # 05 Y:1995 | 05 | 1995 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $720 | $5,000 | Not Implemented |
HO0121 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,437 | $2,318 | Implemented |
HO0121 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $739 | $598 | Implemented |
HO0121 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,913 | $2,160 | Implemented |
AS0165 # 01 Y:1995 | 01 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,443 | $8,000 | n/a |
AS0165 # 04 Y:1995 | 04 | 1995 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,748 | $426 | n/a |
AS0165 # 05 Y:1995 | 05 | 1995 | INSULATE BARE EQUIPMENT | $1,409 | $4,988 | n/a |