IAC logo
IAC Assessment: AS0165
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0165
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1995
Principal Product Colored Plastic Resins
NAICS n/a
SIC 3087 - Custom Compound Purchased Resins
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 25,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,679 719,519 kWh $0.10
TOTAL ENERGY COSTS $73,679
RECOMMENDED SAVINGS* $16,244 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,443
Cost:
$8,000
$4,443 45,428 $4,443
45,428
kWh
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,309
Cost:
$3,918
$3,309 31,946 $3,309
31,946
kWh
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$391
Cost:
-
$391 3,810 $391
3,810
kWh
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,748
Cost:
$426
$1,748 23,447 $1,748
23,447
kWh
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,409
Cost:
$4,988
$1,409 14,361 $1,409
14,361
kWh
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,574
Cost:
$7,707
$2,574 26,964 $2,574
26,964
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,842
Cost:
$3,169
$1,842 18,464 $1,842
18,464
kWh
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$528
Cost:
$675
$528 7,034 $528
7,034
kWh
TOTAL RECOMMENDED Savings:
$16,244
Cost:
$28,883
$16,244 171,454 $16,244
171,454
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage