Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
297
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0045 # 02 Y:2009 | 02 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,746 | $4,200 | Not Implemented |
MZ0045 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,645 | $0 | Implemented |
MZ0045 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,876 | $46,050 | Implemented |
MZ0045 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,734 | $950 | Implemented |
MZ0045 # 05 Y:2009 | 05 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $23,660 | $0 | Implemented |
UD0809 # 01 Y:2009 | 01 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $22,565 | $5,640 | Implemented |
UD0809 # 08 Y:2009 | 08 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,116 | $23,400 | Implemented |
UD0809 # 12 Y:2009 | 12 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,411 | $8,270 | Not Implemented |
UD0809 # 11 Y:2009 | 11 | 2009 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,858 | $480 | Not Implemented |
UD0809 # 05 Y:2009 | 05 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,288 | $324 | Not Implemented |
UD0809 # 09 Y:2009 | 09 | 2009 | INSULATE BARE EQUIPMENT | $2,822 | $1,440 | Not Implemented |
UD0809 # 16 Y:2009 | 16 | 2009 | DISCONNECT BALLASTS | $532 | $0 | Not Implemented |
UD0809 # 13 Y:2009 | 13 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,348 | $1,703 | Implemented |
UD0809 # 07 Y:2009 | 07 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,812 | $0 | Not Implemented |
UD0809 # 14 Y:2009 | 14 | 2009 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,678 | $5,467 | Not Implemented |
UD0809 # 06 Y:2009 | 06 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,845 | $1,000 | Not Implemented |
UD0809 # 15 Y:2009 | 15 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $685 | $0 | Not Implemented |
UD0809 # 02 Y:2009 | 02 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,495 | $120,000 | Implemented |
UD0809 # 17 Y:2009 | 17 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $414 | $0 | Implemented |
UD0809 # 19 Y:2009 | 19 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $181 | $500 | Not Implemented |
UD0809 # 03 Y:2009 | 03 | 2009 | OPTIMIZE PLANT POWER FACTOR | $15,628 | $20,000 | Not Implemented |
UD0809 # 18 Y:2009 | 18 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $363 | $0 | Not Implemented |
UD0809 # 10 Y:2009 | 10 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,765 | $1,048 | Implemented |
UD0809 # 04 Y:2009 | 04 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,423 | $0 | Implemented |
MZ0043 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $192,075 | $12,080 | Implemented |