Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
424
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0909 # 02 Y:2017 | 02 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,594 | $411 | Not Implemented |
GT0909 # 04 Y:2017 | 04 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,551 | $7,915 | Not Implemented |
GT0909 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,255 | $36,180 | Implemented |
GT0909 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $3,363 | $240 | Not Implemented |
GT0909 # 05 Y:2017 | 05 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $49,838 | $321,120 | Implemented |
NL0014 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $9,200 | $1,630 | Implemented |
NL0014 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,804 | $2,500 | Implemented |
NL0014 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $260 | $225 | Not Implemented |
NL0014 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,430 | $12,500 | Implemented |
NL0014 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,100 | $0 | Implemented |
LE0444 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $31,107 | $30 | Implemented |
LE0444 # 03 Y:2017 | 03 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $158 | $80 | Not Implemented |
LE0444 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $917 | $30 | Implemented |
LE0444 # 10 Y:2017 | 10 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,541 | $6,960 | Implemented |
LE0444 # 09 Y:2017 | 09 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,905 | $38,160 | Not Implemented |
LE0444 # 07 Y:2017 | 07 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $36,995 | $122,160 | Not Implemented |
LE0444 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,646 | $1,000 | Not Implemented |
LE0444 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $110,990 | $170,000 | Implemented |
LE0444 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,628 | $5,580 | Implemented |
LE0444 # 11 Y:2017 | 11 | 2017 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $233,480 | $1,905,000 | Implemented |
LE0444 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,762 | $46,000 | Implemented |
MI0323 # 08 Y:2017 | 08 | 2017 | USE SOLAR HEAT TO HEAT WATER | $1,635 | $1,500 | Implemented |
MI0323 # 06 Y:2017 | 06 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,290 | $7,150 | Implemented |
MI0323 # 05 Y:2017 | 05 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,024 | $26,400 | Not Implemented |
MI0323 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,380 | $1,660 | Implemented |