IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

259

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0019 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,428 $56 Implemented
ST0019 # 03 Y:1985 03 1985 INSTALL AUTOMATIC STACK DAMPER $1,259 $856 Not Implemented
ST0019 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $691 $300 Implemented
ST0019 # 05 Y:1985 05 1985 USE OPTIMUM THICKNESS INSULATION $541 $240 Implemented
ST0019 # 06 Y:1985 06 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $666 $150 Implemented
ST0019 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $74 $55 Not Implemented
ST0019 # 08 Y:1985 08 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,350 $0 Implemented
ST0019 # 09 Y:1985 09 1985 USE COMPRESSOR AIR FILTERS $148 $40 Implemented
ST0019 # 10 Y:1985 10 1985 RECOVER WASTE HEAT FROM EQUIPMENT $274 $500 Implemented
ST0019 # 11 Y:1985 11 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $906 $175 Implemented
ST0019 # 12 Y:1985 12 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,567 $1,900 Implemented
ST0019 # 13 Y:1985 13 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,654 $537 Implemented
ST0019 # 14 Y:1985 14 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $2,858 $150 Implemented
UD0151 # 01 Y:1985 01 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $162 $0 Not Implemented
UD0151 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,349 $315 Implemented
UD0151 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $795 $284 Not Implemented
GT0240 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $360 $363 Implemented
GT0240 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $93 Implemented
GT0240 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $453 $400 Implemented
GT0240 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $180 $250 Implemented
GT0240 # 05 Y:1985 05 1985 USE MINIMUM SAFE OVEN VENTILATION $780 $0 Implemented
GT0240 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,420 $5,000 Implemented
MA0014 # 01 Y:1985 01 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,022 $2,622 Implemented
MA0014 # 02 Y:1985 02 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,281 $384 Not Implemented
MA0014 # 03 Y:1985 03 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $329 $186 Implemented