IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0163 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,890 $4,255 Not Implemented
MA0163 # 04 Y:1989 04 1989 OPTIMIZE PLANT POWER FACTOR $9,247 $7,253 Not Implemented
MA0163 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,670 $0 Not Implemented
MA0163 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,427 $0 Implemented
MA0164 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,159 $4,126 Not Implemented
MA0164 # 04 Y:1989 04 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,624 $17,000 Not Implemented
MA0164 # 03 Y:1989 03 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $529 $500 Not Implemented
MA0164 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $4,170 $3,456 Not Implemented
MA0164 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $187 Not Implemented
MA0163 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $285 Implemented
GT0386 # 05 Y:1989 05 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $339 $0 Implemented
GT0386 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $20 Implemented
GT0386 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN WATER LINES AND VALVES $921 $150 Implemented
GT0386 # 08 Y:1989 08 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,015 $39,300 Implemented
RU0069 # 01 Y:1989 01 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,570 $6,745 Not Implemented
RU0069 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,131 $700 Implemented
RU0069 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,084 $0 Implemented
RU0069 # 04 Y:1989 04 1989 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,071 $0 Not Implemented
RU0069 # 05 Y:1989 05 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,985 $2,500 Not Implemented
MA0159 # 03 Y:1989 03 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $2,298 $2,700 Implemented
MA0159 # 06 Y:1989 06 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $752 $0 Implemented
MA0159 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $980 $1,800 Not Implemented
MA0159 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $444 $297 Implemented
MA0159 # 07 Y:1989 07 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,297 $2,190 Not Implemented
MA0159 # 02 Y:1989 02 1989 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $684 $3,027 Implemented