Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
195
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0118 # 01 Y:1991 | 01 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,432 | $0 | Implemented |
OR0118 # 02 Y:1991 | 02 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,838 | $0 | Implemented |
OR0118 # 03 Y:1991 | 03 | 1991 | INSULATE BARE EQUIPMENT | $3,367 | $3,124 | Implemented |
OR0118 # 04 Y:1991 | 04 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $383 | $919 | Implemented |
OR0118 # 05 Y:1991 | 05 | 1991 | OPTIMIZE PLANT POWER FACTOR | $2,040 | $5,100 | Implemented |
OR0118 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $312 | $1,177 | Implemented |
RU0117 # 01 Y:1991 | 01 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,153 | $0 | Implemented |
RU0117 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,912 | $518 | Implemented |
RU0117 # 03 Y:1991 | 03 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,681 | $700 | Implemented |
RU0117 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $827 | $200 | Implemented |
RU0117 # 05 Y:1991 | 05 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $552 | $135 | Implemented |
SD0002 # 01 Y:1991 | 01 | 1991 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $4,725 | $3,100 | Implemented |
SD0002 # 02 Y:1991 | 02 | 1991 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $11,147 | $300 | Implemented |
SD0002 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $1,086 | $5,550 | Implemented |
SD0002 # 04 Y:1991 | 04 | 1991 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $580 | $600 | Implemented |
SD0002 # 05 Y:1991 | 05 | 1991 | KEEP LAMPS AND REFLECTORS CLEAN | $752 | $3,780 | Implemented |
KU0343 # 01 Y:1991 | 01 | 1991 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $6,206 | $8,000 | Not Implemented |
KU0343 # 02 Y:1991 | 02 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,448 | $2,000 | Not Implemented |
KU0343 # 03 Y:1991 | 03 | 1991 | REPAIR AND ELIMINATE STEAM LEAKS | $2,793 | $400 | Not Implemented |
KU0343 # 04 Y:1991 | 04 | 1991 | INSULATE BARE EQUIPMENT | $2,239 | $4,365 | Not Implemented |
KU0343 # 05 Y:1991 | 05 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,754 | $5,500 | Not Implemented |
KU0343 # 06 Y:1991 | 06 | 1991 | INSTALL TURBULATORS | $1,282 | $3,157 | Not Implemented |
KU0343 # 07 Y:1991 | 07 | 1991 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,423 | $6,200 | Not Implemented |
KU0343 # 08 Y:1991 | 08 | 1991 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,315 | $0 | Not Implemented |
KU0343 # 09 Y:1991 | 09 | 1991 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,545 | $4,800 | Not Implemented |