Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsSIC | 301 | Tires And Inner Tubes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0085 # 01 Y:2012 | 01 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $6,264,801 | $14,443,176 | Not Implemented |
UA0085 # 10 Y:2012 | 10 | 2012 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $529,960 | $400,000 | Not Implemented |
UA0085 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $349,571 | $177,363 | Not Implemented |
UA0085 # 08 Y:2012 | 08 | 2012 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $48,968 | $131,587 | Not Implemented |
UA0085 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $58,443 | $1,920 | Implemented |
UA0085 # 06 Y:2012 | 06 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $146,229 | $68,100 | Not Implemented |
UA0085 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $151,364 | $35,390 | Implemented |
UA0085 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,936 | $7,682 | Not Implemented |
UA0085 # 03 Y:2012 | 03 | 2012 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $86,957 | $214,808 | Not Implemented |
UA0085 # 02 Y:2012 | 02 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $164,656 | $57,024 | Implemented |
SU0318 # 01 Y:2012 | 01 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,626 | $0 | Not Implemented |
SU0318 # 09 Y:2012 | 09 | 2012 | UPGRADE OBSOLETE EQUIPMENT | $211 | $795 | Implemented |
SU0318 # 08 Y:2012 | 08 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $812 | $3,107 | Not Implemented |
SU0318 # 07 Y:2012 | 07 | 2012 | OPTIMIZE PLANT POWER FACTOR | $162,692 | $408,153 | Implemented |
SU0318 # 06 Y:2012 | 06 | 2012 | REDUCE VENTILATION AIR | $3,491 | $4,419 | Not Implemented |
SU0318 # 05 Y:2012 | 05 | 2012 | ELIMINATE/REDUCE AN OPERATION | $12,250 | $11,115 | Not Implemented |
SU0318 # 04 Y:2012 | 04 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $106,547 | $32,436 | Implemented |
SU0318 # 03 Y:2012 | 03 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $72 | $0 | Implemented |
SU0318 # 02 Y:2012 | 02 | 2012 | USE SYNTHETIC LUBRICANT | $7,917 | $0 | Implemented |