Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
16
matching recommendationsSIC | 301 | Tires And Inner Tubes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0317 # 01 Y:2024 | 01 | 2024 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $374,993 | $42,000 | n/a |
TT0317 # 02 Y:2024 | 02 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $79,406 | $13,250 | n/a |
TT0317 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $859 | $400 | n/a |
TT0317 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,788 | $13,300 | n/a |
TT0317 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $2,015 | $1,364 | n/a |
TT0317 # 06 Y:2024 | 06 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $169,411 | $120,000 | n/a |
TT0317 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,968 | $2,475 | n/a |
TT0317 # 08 Y:2024 | 08 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $64,353 | $60,000 | n/a |
TT0317 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $6,847 | $8,500 | n/a |
TT0317 # 10 Y:2024 | 10 | 2024 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $56,902 | $80,000 | n/a |
TT0317 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,558 | $39,000 | n/a |
TT0317 # 12 Y:2024 | 12 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,299 | $16,125 | n/a |
TT0317 # 13 Y:2024 | 13 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $205,758 | $600,000 | n/a |
TT0317 # 14 Y:2024 | 14 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $698 | $2,910 | n/a |
TT0317 # 15 Y:2024 | 15 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,295 | $40,000 | n/a |
TT0317 # 16 Y:2024 | 16 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $4,116 | $50,000 | n/a |