Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 302 Rubber And Plastics Footwear
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0475 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,945 $0 Not Implemented
UD0475 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,500 $5,000 Not Implemented
BD0010 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,148 $6,967 n/a
BD0010 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,941 $1,000 n/a
BD0010 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $2,052 $500 n/a
BD0010 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,877 $15,000 n/a
BD0010 # 05 Y:1994 05 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $70,663 $1,500 n/a
MO0083 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,699 $2,195 Implemented
MO0083 # 01 Y:1993 01 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,261 $13,500 Not Implemented
MO0083 # 02 Y:1993 02 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,998 $336 Not Implemented
MO0083 # 03 Y:1993 03 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,773 $75 Implemented
MO0083 # 08 Y:1993 08 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $186 $401 Not Implemented
MO0083 # 07 Y:1993 07 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,098 $2,381 Not Implemented
MO0083 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,216 $3,873 Not Implemented
MO0083 # 04 Y:1993 04 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,343 $2,703 Not Implemented
GT0268 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $150 Implemented
GT0268 # 03 Y:1985 03 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $480 $4,250 Not Implemented
GT0268 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7 $0 Not Implemented
GT0268 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $561 $1,254 Not Implemented
GT0195 # 05 Y:1983 05 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,800 $9,000 Not Implemented
GT0195 # 04 Y:1983 04 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,900 $4,730 Implemented
GT0195 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,975 $473 Implemented
GT0195 # 02 Y:1983 02 1983 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,500 $500 Implemented
GT0195 # 01 Y:1983 01 1983 INSULATE BARE EQUIPMENT $1,500 $530 Implemented