IAC logo
IAC Assessment: UD0475
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0475
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product rubber footwear
NAICS n/a
SIC 3021 - Rubber And Plastics Footwear
Sales $10,000,000-$50,000,000
# of Employees 78
Plant Area (Sq.Ft.) 146,000
Annual Production 4,000,000 Pieces
Production Hrs. Annual 7,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $253,900 4,793,376 kWh $0.05
Natural Gas $155,955 40,581 MMBtu $3.84
TOTAL ENERGY COSTS $409,855
RECOMMENDED SAVINGS* $219,819 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes
$ kWh $ MMBtu $ $ $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$13,500
Cost:
$5,000
- - - - - - $13,500 - -
-
kWh
-
-
MMBtu
-
-
$
$13,500
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,945
Cost:
-
$5,070 112,544 - - - - $875 - $5,070
112,544
kWh
-
-
MMBtu
-
-
$
$875
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,535
Cost:
$4,300
$10,519 150,059 $(-1,984) (-640) - - - - $10,519
150,059
kWh
$(-1,984)
(-640)
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,114
Cost:
$8,000
$8,114 135,111 - - - - - - $8,114
135,111
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,440
Cost:
$10,410
$6,440 67,702 - - - - - - $6,440
67,702
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,260
Cost:
$16,682
$10,501 202,814 $(-1,241) (-400) - - - - $10,501
202,814
kWh
$(-1,241)
(-400)
MMBtu
-
-
$
-
-
$
07: 2.5193 CONVERT FROM BATCH TO CONTINUOUS OPERATION Savings:
$168,025
Cost:
$200,000
$18,025 271,688 - - $140,000 - $10,000 - $18,025
271,688
kWh
-
-
MMBtu
$140,000
-
$
$10,000
-
$
TOTAL RECOMMENDED Savings:
$219,819
Cost:
$244,392
$58,669 939,918 $(-3,225) (-1,040) $140,000 - $24,375 - $58,669
939,918
kWh
$(-3,225)
(-1,040)
MMBtu
$140,000
-
$
$24,375
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes