Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,176
matching recommendationsSIC | 305 | Hose & Belting & Gaskets & Packing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0299 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $9,312 | $22,135 | n/a |
TT0299 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $632 | $750 | n/a |
TT0299 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,478 | $8,003 | n/a |
TT0299 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $221 | $90 | n/a |
TT0299 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,491 | $40 | n/a |
TT0299 # 05 Y:2023 | 05 | 2023 | REDUCE HEAT GAIN BY WINDOW TINTING | $809 | $3,500 | n/a |
TT0299 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,097 | $30 | n/a |
TT0299 # 07 Y:2023 | 07 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $387 | $100 | n/a |
AM0870 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $771 | $13 | Not Implemented |
AM0870 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $21,750 | $7,500 | Implemented |
AM0870 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $351 | $1,000 | Implemented |
AM0870 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $117 | $160 | Implemented |
AM0862 # 01 Y:2023 | 01 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $80,175 | $8,170 | Implemented |
AM0862 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,080 | $16,563 | Implemented |
AM0862 # 03 Y:2023 | 03 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $18,325 | $6,300 | Implemented |
AM0862 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,300 | $9,000 | Not Implemented |
AM0862 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $27,516 | $41,926 | Implemented |
AM0862 # 06 Y:2023 | 06 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,203 | $4,750 | Implemented |
OK1077 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,215 | $230,880 | Not Implemented |
OK1077 # 04 Y:2022 | 04 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,586 | $7,371 | Not Implemented |
OK1077 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,255 | $7,590 | Not Implemented |
OK1077 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,559 | $9,108 | Not Implemented |
OK1077 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $530 | $347 | Implemented |
UU0204 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $45,240 | $17,600 | Not Implemented |
UU0204 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,275 | $12,600 | Not Implemented |