IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0748 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $303 $108 Implemented
UD0748 # 04 Y:2006 04 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,988 $2,960 Not Implemented
UD0748 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,200 $840 Implemented
UD0748 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $7,546 $0 Implemented
UD0748 # 01 Y:2006 01 2006 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $432,000 $143,750 Not Implemented
LM0112 # 02 Y:2006 02 2006 ADJUST VENTS TO MINIMIZE ENERGY USE $19,700 $0 Not Implemented
LM0112 # 06 Y:2006 06 2006 ADD ADDITIONAL PRODUCTION SHIFT $1,348 $0 Implemented
LM0112 # 05 Y:2006 05 2006 MODIFY STARTUP/SHUTDOWN TIMES $10,000 $0 Not Implemented
LM0112 # 04 Y:2006 04 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $433,948 $1,000 Not Implemented
LM0112 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,130 $8,728 Implemented
LM0112 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $200 Implemented
SD0376 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,522 $143,750 Not Implemented
SD0376 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,390 $43,125 Not Implemented
SD0376 # 03 Y:2006 03 2006 AVOID FROST FORMATION ON EVAPORATORS $16,408 $31,225 Implemented
SD0376 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,062 $31,291 Implemented
SD0376 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,642 $0 Implemented
SD0376 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,516 $12,616 Not Implemented
SD0376 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $502 Implemented