Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2006 |
Principal Product | seals and valves |
NAICS | 339991 - Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053 - Gaskets, Packing And Sealing Devices |
Sales | $50,000,000-$100,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 182,000 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 6,280 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $399,704 | 6,093,966 | kWh | $0.07 |
Electricity Demand | $252,349 | 14,086 | kW-months/year | $17.91 |
Natural Gas | $72,038 | 8,630 | MMBtu | $8.35 |
TOTAL ENERGY COSTS | $724,091 | |||
RECOMMENDED SAVINGS* | $466,741 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,093 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $615 Cost: $200 |
$414 | 5,588 | $201 | 11 | - | - | - | - |
$414 5,588 kWh |
$201 11 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6122 ADJUST VENTS TO MINIMIZE ENERGY USE |
Savings: $19,700 Cost: - |
$19,700 | 197,000 | - | - | - | - | - | - |
$19,700 197,000 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,130 Cost: $8,728 |
$667 | 9,017 | $463 | 25 | - | - | - | - |
$667 9,017 kWh |
$463 25 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $433,948 Cost: $1,000 |
$25,948 | 350,750 | - | - | - | - | $408,000 | - |
$25,948 350,750 kWh |
- - kW-months/year |
- - MMBtu |
$408,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $10,000 Cost: - |
- | - | - | - | $10,000 | 1,206 | - | - |
- - kWh |
- - kW-months/year |
$10,000 1,206 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.451 ADD ADDITIONAL PRODUCTION SHIFT |
Savings: $1,348 Cost: - |
$1,348 | 18,224 | - | - | - | - | - | - |
$1,348 18,224 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $466,741 Cost: $9,928 |
$48,077 | 580,579 | $664 | 36 | $10,000 | 1,206 | $408,000 | - | $48,077 580,579 kWh |
$664 36 kW-months/year |
$10,000 1,206 MMBtu |
$408,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,093 Cost: $8,928 |
$2,429 | 32,829 | $664 | 36 | - | - | - | - | $2,429 32,829 kWh |
$664 36 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |