IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

442

matching recommendations
Reset
SIC 3052 Rubber & Plastics Hose & Belting
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0343 # 06 Y:1991 06 1991 INSTALL TURBULATORS $1,282 $3,157 Not Implemented
KU0343 # 07 Y:1991 07 1991 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,423 $6,200 Not Implemented
KU0343 # 08 Y:1991 08 1991 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,315 $0 Not Implemented
KU0343 # 09 Y:1991 09 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,545 $4,800 Not Implemented
KU0343 # 10 Y:1991 10 1991 ISOLATE HOT OR COLD EQUIPMENT $1,003 $2,180 Not Implemented
KU0343 # 11 Y:1991 11 1991 IMPROVE LUBRICATION PRACTICES $542 $0 Not Implemented
KU0343 # 12 Y:1991 12 1991 INSTALL SET-BACK TIMERS $705 $110 Not Implemented
KU0343 # 13 Y:1991 13 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $447 $560 Not Implemented
KU0343 # 14 Y:1991 14 1991 INSTALL SET-BACK TIMERS $100 $110 Not Implemented
KU0297 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $218 $119 Implemented
KU0297 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,367 $0 Not Implemented
KU0297 # 03 Y:1989 03 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,843 $3,200 Not Implemented
KU0297 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $1,200 Implemented
KU0297 # 05 Y:1989 05 1989 OPTIMIZE PLANT POWER FACTOR $7,688 $13,500 Implemented
KU0297 # 06 Y:1989 06 1989 TREAT AND REUSE RINSE WATERS $15,540 $9,000 Implemented
KU0297 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,339 $7,000 Not Implemented
KU0297 # 08 Y:1989 08 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $581 $350 Implemented
KU0225 # 01 Y:1987 01 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,036 $4,546 Implemented
KU0225 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $8,616 $500 Implemented
KU0225 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $13,017 $8,000 Implemented
KU0225 # 04 Y:1987 04 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $115 $0 Implemented
KU0225 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $942 $0 Implemented
KU0225 # 06 Y:1987 06 1987 INSTALL AUTOMATIC STACK DAMPER $1,432 $300 Not Implemented
KU0225 # 07 Y:1987 07 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $713 $50 Implemented
KU0225 # 08 Y:1987 08 1987 RECOVER WASTE HEAT FROM EQUIPMENT $1,280 $800 Not Implemented